It starts with the subfloor
Most flooring complaints trace back to what is underneath rather than to the floor itself. So the old floor comes out first and the subfloor gets checked properly: moisture, squeaks, soft spots, and how flat it actually is. Anything out of tolerance gets ground down or filled with levelling compound before a single plank or tile goes down, because whatever is left under there telegraphs through the new floor sooner or later. Where a subfloor has gone past repair it gets replaced rather than covered over and forgotten about.
Once the base is right we lay tile, luxury vinyl plank or laminate. The layout is set out before anything is fixed down, so cuts land where they are least noticeable and a full plank meets the doorway instead of a two-inch sliver. Then thresholds, transitions and trim go on, because that is where a floor either meets the rest of the house cleanly or does not.
Whole house or a single room. Some jobs turn out to need more than flooring. A wall opened up, drywall patched, trim repainted: the same crew handles that too.
















1 / 16